Electrician testing a modern consumer unit fuse board

Fuse Board Upgrades

Modern boards, properly fitted

Old boards swapped for modern RCBO consumer units, labelled and certified — done the right way, in the right order, with no shortcuts.

EICR first — here's why

Always an EICR first

We always recommend that an EICR report is carried out before changing your fuse board, as per the regulations BS 7671. The report tells us the true condition of every circuit the new board will protect — so there are no unwanted or unforeseen issues waiting for you after the swap.

The cowboys probably will not tell you this. Fit-and-forget board swaps without testing can leave hidden faults behind.

If we carry out your EICR and you decide to use us to carry out any remedial works required, we will refund part of the EICR cost as a goodwill gesture. We really do aim to please and treat our clients with the ultimate courtesy and respect.

Modern RCBO consumer unit being tested

What we do

  • EICR before the change

    A full condition report on your circuits, per BS 7671.

  • Remedials completed

    Any issues the report finds are fixed and certified first.

  • Modern RCBO board fitted

    Labelled, tested and fully compliant with today's regs.

  • Certified & notified

    Electrical certificate issued and building regs notified.

Signs you need a new board

RCD protection missing

Old boards with no RCDs leave you far less protected against electric shock than today's standards require.

Frequent tripping or fuses blowing

Constant nuisance tripping usually means the board or the circuits it protects need proper attention.

Wood or plastic-backed rewireable fuses

Cast-iron units and rewireable fuse boards are decades past their design life and can't trip fast enough.

Buzzing, hot or scorch marks

Any heat, buzzing or browning around the board is a warning sign — get it looked at straight away.

Bookings Monday–Friday · 24-hour emergency line — call 07852 923 205

Book your fuse board upgrade

Honest advice, the EICR done first, and part of the EICR cost refunded when we do the works. One team, start to finish.